Hydrotor systems in development
Our initial work focuses on telecommunications sites and data centres, bringing together system design, electrical integration and practical operating requirements.

Telecommunications sites
The 10 kW Hydrotor system is being developed for telecommunications sites, including remote locations. Work with a telecommunications company focuses on electrical integration, operating requirements and application-specific testing.
- Application: Telecommunications sites
- Program focus: Pilot construction, electrical integration and application testing
Data-centre applications
Development begins with a 1 MW Hydrotor system for data-centre applications. The illustration shows a future configuration of five separate 1 MW units, representing a planned 5 MW arrangement. Engineering work focuses on electrical integration and site infrastructure.
- Application: Data centres
- Program focus: Pilot development and site integration

A staged path to larger applications
Engineering progresses from individual systems toward potential multi-unit configurations. The focus is on measured performance, dependable controls, practical installation and the infrastructure needed to support larger applications.