Pilot Programs

Hydrotor systems in development

Our initial work focuses on telecommunications sites and data centres, bringing together system design, electrical integration and practical operating requirements.

Concept illustration of a blue 10 kW Hydrotor system beside a remote telecommunications tower
10 kW Hydrotor concept for a remote telecommunications site.
10 kW system

Telecommunications sites

The 10 kW Hydrotor system is being developed for telecommunications sites, including remote locations. Work with a telecommunications company focuses on electrical integration, operating requirements and application-specific testing.

  • Application: Telecommunications sites
  • Program focus: Pilot construction, electrical integration and application testing
1 MW system

Data-centre applications

Development begins with a 1 MW Hydrotor system for data-centre applications. The illustration shows a future configuration of five separate 1 MW units, representing a planned 5 MW arrangement. Engineering work focuses on electrical integration and site infrastructure.

  • Application: Data centres
  • Program focus: Pilot development and site integration
Concept illustration of five separate 1 MW Hydrotor units beside a data centre
Future configuration concept: five 1 MW units; initial development focus: 1 MW.
Development approach

A staged path to larger applications

Engineering progresses from individual systems toward potential multi-unit configurations. The focus is on measured performance, dependable controls, practical installation and the infrastructure needed to support larger applications.